EFECTOLED SUCCESS STORY
How efectoLED Centralized 40,000 SKUs and Reduced Its Time-to-Market by 60%
Discover how efectoLED, a leading e-commerce company in the distribution and sale of lighting products and electrical supplies, centralized 40,000 SKUs and reduced its time-to-market by 60% with the help of Infoverity. To continue growing without letting product data become a bottleneck, the company chose a PIM system and sought a partner to guide it through the configuration and migration of its catalog. David Rojas, Project Manager in the Organization and Systems department at efectoLED, explains how they did it.
A growing catalog doesn’t have to slow you down: efectoLED didn’t start with the tool, but with the processes and the people who would be using it. If your team is at that point—an expanding catalog, scattered information, and a PIM decision on the table—let’s talk about what your migration would look like. Schedule a 30-minute conversation with the team that supported efectoLED.
A catalog of more than 40,000 SKUs and no single point of entry
efectoLED is an e-commerce company specializing in the distribution and sale of lighting products and electrical supplies. Headquartered in the province of Valencia and with more than 250 employees, it is a leader in the European Union, with a presence in more than 13 markets.
Over more than ten years in business, the volume and complexity of the catalog information grew exponentially, eventually exceeding 40,000 SKUs. The company needed to manage all that data in an agile, secure, and efficient manner, centralize it in a single point of entry, and support it with robust processes.
After a careful selection process, efectoLED opted for a market-leading PIM system. As they analyzed the scope of the project, a second decision emerged—one just as important as the first: they needed someone with real-world experience in configuration and data migration to lead the way. That’s where Infoverity comes in.
Objectives and Challenges
The work with Infoverity focused on three areas: setting a realistic timeline, gaining a thorough understanding of the new tool, and applying its capabilities to the efectoLED business model.
The objectives were clear from the start:
- Set up the system and embed the knowledge within the company. Configure the tool and, at the same time, build a solid knowledge base within the company to support its use. The goal was not to deliver a fully functional PIM, but rather a team capable of operating it without relying on the consultant.
- Prepare the catalog for migration. Create the file structure needed to migrate more than 40,000 SKUs. This is the least visible part of the project and the one that determines whether the migration is done once or three times.
- A workflow that reflects the business. Define a workflow—with its roles and permissions—capable of addressing efectoLED’s business logic. Who creates the data, who validates it, and who publishes it ceases to be a matter of habit and becomes a process.
The real risk of a project like this isn’t technical. An e-commerce business with a presence in more than 13 markets cannot afford a pause while changing the way product data is entered. The new tool and the new processes had to be implemented while the business was operating at full capacity.
A single point of entry
All product data is created and edited in a single system. For the company's other systems, the change was seamless.
Complete catalog migration
More than 40,000 records migrated to a file structure designed to handle that volume.
60% shorter time-to-market
The product reaches the market in about 60% less time, and with higher data quality.

Internally, our department adopted the phrase “nothing changes, but everything changes”: for the rest of the company’s systems, the change would be transparent, with only the point of entry and editing for products being modified.
David Rojas
Project Manager, efectoLED
We found a partner, a guide, and a traveling companion who understood our needs and didn't just follow the playbook: they provided us with the technical support we needed to adapt our ideas and processes to the PIM standard.
David Rojas
Project Manager, efectoLEDMeasurable business results
- Complete migration of the catalog to the new PIM, with more than 40,000 SKUs managed from a single point of entry.
- Time-to-market reduced by approximately 60%, with higher-quality product data.
- A workflow that mirrors the business: roles and permissions defined so that each department works with the data relevant to it.
- Improved collaboration between departments in managing and accessing data—one of the project’s most unexpected and highly valued outcomes.
- Knowledge that stays in-house: the efectoLED team operates the tool independently, without relying on the consultant for day-to-day operations.
- Product Information Management (PIM)
- Data Quality
- Workflow and Business Processes
CASE STUDIES
- Catalog Migration
- Single Point of Data Entry
- Reduced Time to Market
- Distribution and E-commerce — Lighting and Electrical Supplies
- EMEA — Spain
Start with the process, not the tool
efectoLED didn’t save time by installing a tool, but by first defining who creates the data, who validates it, and where it comes from. If that process isn’t clear in your company yet, that’s the best place to start.